Bitumen solution K-70

BITUMEN SOLUTION BIL 80/85
How to use:
Clean and dry the surfaces to be treated, if necessary, and use bitumen solution K-80 as a primer. The actual moisture insulation is carried out by brushing or rolling the surface at least twice with bitumen solution K-70. The surfaces must be allowed to dry fully between each layer. Consumption for each layer 0.6…1.0 l/m2. Stains and tools are cleaned up mechanically, using white spirit or mineral turpentine.

PLEASE NOTE: Do not apply to a hot surface, mix with hot bitumen or brush the coated surface with hot bitumen immediately after the application.

Properties:
Drying time 2-4 hours at + 20 °C, depending on the thickness of the layers. In cold, damp conditions, the drying time may be many times longer.

Storing:
In a dry place protected against sunlight and heat.

Instructions for environmental protection:
Empty package and a dried product can be taken to a landfill. Waste including fresh product is hazardous waste, which needs to be disposed of in accordance with waste management legislation and instructions from the environmental authorities.

  • Bitumen solution K-70
  • -
  • -
  • -